Construction Logistics Software
Delivery logistics that
works without
constant queries
Through the intuitive online delivery booking system, trade contractors book loading zones and resources on their own, and you keep the overview without having to push every step yourself. Ideal for large and complex construction sites.

Rated with 5.0 stars on independent rating platforms

Trade contractors make bookings on their own in under a minute

Double bookings are automatically prevented before they become a problem

Draw and book storage areas directly instead of manually maintaining static site setup plans
Trade contractors make bookings on their own in under a minute
Double bookings are automatically prevented before they become a problem
Draw and book storage areas directly instead of manually maintaining static site setup plans
Trade contractors make bookings on their own in under a minute
Double bookings are automatically prevented before they become a problem
Draw and book storage areas directly instead of manually maintaining static site setup plans
More than 150,000 workers rely on Bausicht
Everyday site logistics with the old tools
Why are you managing access control and construction logistics in separate systems?
Bausicht clears up the chaos.
Practical construction logistics software that explains itself
The trend is that a site manager is in Dortmund today and in Bochum tomorrow. For that, he needs construction logistics software that keeps pace instead of holding him up
No entry barriers for trade contractors
Simply start: The construction logistics software is ready to use immediately and requires no complex setup.
- One login for online delivery booking, loading zones and area management in one system
- Bookings in under 1 minute by clicking instead of filling out forms
- Fewer queries to the logistics team thanks to an intuitive system
Zero error rate and no waiting times
The online delivery booking system automatically coordinates time slots, loading zones and resources. At the gate, a camera reads the registered license plate and opens the barrier within the booked time slot.
- Double bookings of loading zones and loading equipment are automatically prevented
- Optimal utilization of resources such as hoists, cranes and forklifts
- License plate recognition opens the barrier for announced deliveries, with no staff needed at the gate

Site setup plans stay up to date
Area management in real time: storage and site setup areas can be adjusted continuously.
- Draw or modify storage and site setup areas directly in the program
- Optimal use of limited space on the construction site
- No more error-prone Excel lists
Who Bausicht is the right partner for
Bausicht is in daily use on more than 400 construction sites and with over 50 customers, including these customer profiles:
Construction logistics providers
- 5 to over 200 construction sites in parallel, building construction in both shell and fit-out phases.
- 20 to over 100 subcontractors and 100 to 2,000+ people per project.
- Access control and compliance in the scope of services, typically from a construction volume of 50 million euros.
- Growth without additional coordination staff, replacing isolated point solutions.
General contractors
- Turnkey building construction, from offices, residential, hotels and urban quarters through to KRITIS projects.
- Often 100+ subcontractors and 1,000+ workers per site, with over 2,000 subcontractors across all projects.
- Compliance and documentation duties, including minimum wage, A1 and general contractor liability.
- Little time for system upkeep, the site simply has to run smoothly.
Why Bausicht is the right
partner for your construction logistics
License plate recognition
The system opens the barrier automatically for announced deliveries within the time slot with a registered license plate.
Open the barrier with a delivery slip
Suppliers receive a QR code booking slip and open the barrier automatically within the delivery time slot by presenting it.
Calendar view
Keep track of your deliveries and book your next delivery directly in the calendar, just like in Outlook.
Google Maps integration
Add Google Maps links for all entrances and unloading zones. Suppliers receive these by email in their delivery confirmation.
Mobile app
Access all deliveries and bookings on the go. With the mobile app, logistics managers and subcontractors always have the full overview, right from their smartphone.
Multi-story storage areas and LEAN takt planning
Store multiple site setup plans for different floors and time periods. The correct plan is selected automatically based on the chosen time period.
Automatic report generation
Select a time period, set filters and generate a complete delivery report for invoicing at the push of a button.
Simple communication
Everyone involved receives a delivery confirmation by email and is automatically notified of changes or cancellations.
Trusted by 50+ satisfied customersin daily use
Questions about the construction logistics software? We have answers.
We have listed the most frequently asked questions for you
Question not covered here?
We answer it in a call and walk you through the module on a sample construction site.
Free ConsultationYes, in the settings you can individually define which information you require from carriers to meet your requirements (for example how many pallets of which material are delivered with which vehicle type).
"What stands out most is how adaptable the platform is; it can be tailored perfectly to the needs of each individual project. The support is excellent."
Yes, bulk and recurring transports for repeating deliveries can easily be registered to save time when creating delivery bookings.
Yes, delivery zones, construction equipment and sections of storage areas can be blocked for a specific period of time.
Yes, a list of all deliveries is available for printing. Alternatively, you can use the free Bausicht app on your smartphone to view all deliveries in real time. In addition, you can print QR codes via the construction logistics software that allow people on site to view all deliveries in real time, without any login.
Without any training: subcontractors receive a link, register themselves and book delivery slots in under a minute with a few clicks instead of forms. The interface is multilingual and deliberately simple, which noticeably reduces the queries coming back to the logistics team.
"The first thing that changed when we started working with Bausicht: queries went down by 40 percent. They get a link, register, upload their documents and they're done."
Announced deliveries are processed without waiting: within the booked time slot, the barrier opens automatically via license plate recognition or a QR code booking slip, and drivers receive Google Maps links to the correct entrance and unloading zone directly in their delivery confirmation.
"The biggest added value: faster processing, time savings. You have no paperwork or piles of folders standing around, and you have a real degree of control over the construction site."
Yes, with the mobile app, logistics managers and subcontractors always have the full overview of all deliveries and bookings. Assigning permissions and changing settings also works from a laptop or phone, without being on the construction site in person.
"I can be in Dortmund this morning and look after three construction sites in Bochum in the afternoon without getting in the car. I couldn't have imagined that before."
Yes, all our modules can be booked individually. With us, you only pay for what you actually use. You can see your individual price on our pricing page.
No, with Bausicht there is only one login per user, from which you and your subcontractors can access all modules. We deliberately decided against isolated solutions, as they cost a lot of time and effort because you have to enter all data twice and manage different logins.
Yes. Company and personal data is collected only once and in compliance with data protection law: trade contractors conclude their own data processing agreement when accepting their Bausicht invitation and then book delivery slots and areas with the same data.
You can calculate the costs individually on our pricing page. Enter your specific requirements there and receive a tailored quote for your construction site right away.
Thank You!
We have received your message and will get in touch with you soon.
Get in touch with Bausicht
In just 10-20 minutes, our product experts will discuss your requirements and answer all your questions.Far fewer queries
Trade contractors book delivery slots on their own in under a minute
Avoid double bookings and waiting times
Loading zones, cranes and hoists are automatically used to full capacity
Site setup plans stay up to date
Draw areas directly in the program instead of maintaining Excel lists

Rated with 5.0 stars on independent rating platforms













